This information is over 2 years old. Information was current at time of publication.

Falk Library Construction Continues

Construction leading to the new Falk Library is marching forward during the fall 2022 semester! Entry to the library remains on Scaife Hall’s second floor with our Main Desk being the library’s welcome point and service center.

Small adjustments have been made to the library’s tables and study carrel layouts creating welcoming environments supporting both group learning and individual study. Although construction noise is the evidence of progress, it is not always a welcomed event within a library! When possible, advanced notice of construction activity will be posted on the library’s numerous digital displays. Disposable earplugs are always readily available at the library’s Main and Technology Help Desks.