This information is over 2 years old. Information was current at time of publication.{"id":966,"date":"2008-12-05T13:25:03","date_gmt":"2008-12-05T18:25:03","guid":{"rendered":"http:\/\/www.hsls.pitt.edu\/updatereport\/?p=966"},"modified":"2008-12-05T13:25:03","modified_gmt":"2008-12-05T18:25:03","slug":"falk-library-renovations-underway","status":"publish","type":"post","link":"https:\/\/info.hsls.pitt.edu\/updatereport\/falk-library-renovations-underway\/","title":{"rendered":"Falk Library Renovations Underway"},"content":{"rendered":"<p><a href=\"https:\/\/info.hsls.pitt.edu\/updatereport\/files\/2008\/11\/construc1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft\" src=\"https:\/\/info.hsls.pitt.edu\/updatereport\/files\/2008\/11\/construc1.jpg\" alt=\"\" width=\"63\" height=\"37\" \/><\/a>Renovations in Falk Library\u2019s Rare Book and computer areas will begin on December 15, 2008.\u00a0 This two-month project includes long-delayed upgrades to the cooling and humidity controls for Falk Library\u2019s collection of valuable older materials housed on the main floor, and construction of a new, properly ventilated room on the mezzanine floor to house the computer servers managing HSLS e-resources and other online services.<\/p>\n<p>The Rare Books have been moved to another area in Falk Library for safekeeping during construction, but are still available for use by <a href=\"http:\/\/www.hsls.pitt.edu\/about\/libraries\/falk\/rarebook\/using.html\">appointment<\/a>.\u00a0 No service disruptions are anticipated during construction of the new computer server room.\u00a0 The construction crew will try to keep noise and other disturbances to a minimum.<\/p>\n<p>~ Barbara Epstein<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Renovations in Falk Library\u2019s Rare Book and computer areas will begin on December 15, 2008.\u00a0 This two-month project includes long-delayed upgrades to the cooling and humidity controls for Falk Library\u2019s collection of valuable older materials housed on the main floor, and construction of a new, properly ventilated room on the mezzanine floor to house the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"issue-archives","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[6],"tags":[-1],"class_list":["post-966","post","type-post","status-publish","format-standard","hentry","category-6","avhec_catgroup-issue-archives"],"_links":{"self":[{"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/posts\/966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/comments?post=966"}],"version-history":[{"count":0,"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/posts\/966\/revisions"}],"wp:attachment":[{"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/media?parent=966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/categories?post=966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/info.hsls.pitt.edu\/updatereport\/wp-json\/wp\/v2\/tags?post=966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}